The Channel Tunnel High Speed Rail Link crosses the Medway estuary by a major viaduct, comprising two launched segmental post-tensioned concrete approach viaducts, totalling approximately 900m
in length and an insitu concrete post-tensioned balanced cantilever main span section totalling 380m with a 190m
maximum span. The works were let to the Eurolink Joint Venture comprising Miller Civil Engineering, Beton et Monierbau and Dumez
GTM.