A 50m long sheet piled diving jetty was designed by TGP on behalf of Tilbury Douglas Construction.
The sheet piles were driven into chalk and restrained by corrosion protected high strength steel tie rods located just above top water level.
The jetty was partially covered by a galvanised steel canopy but could also accommodate vehicular access.