|
TGP won the design contract for the wheel
foundation, brows and temporary foundation with the Contractor as
part of a design and build contract for this award winning landmark in
Central London.
The erection scheme proposed - to assemble the
wheel horizontally over the River Thames - would impose enormous
forces on the foundation as the wheel is reared up to its
operation position. A fast track approach was required to ensure
early completion of this prestigious project. TGP's role included
design development ensuring the client’s needs for cost certainty
and completion on time were achieved.
|