Cleddau Bridge, Pembrokeshire

  Client: Pembrokeshire County Council
 

Contractor:

Concrete Repairs Ltd
  Value: £120,000
  Date: October - December 2000
 
Six RC piers extending up to 35m above water level were strengthened by wrapping up to seven layers of carbon fibre fabric around the upper 1.8m and impregnating it with epoxy resin.  The resulting CFRP composite was designed to resist bursting forces beneath the bearings in conjunction with pre-tensioned steel bars.  Prior to the strengthening works being carried out, a migrating corrosion inhibitor was applied to the surface of the concrete.

Award

  • ICE - Historic Bridge Awards 2001